Solutions · Contractors

Document the work.
Reduce disputes.
Get paid faster.

Invoice disputes rarely start with the work. They start with the record. When survey pickups can't keep pace with development rates, details between pickups are lost. Come invoice time, the record of the work is a broad reconstruction, rather than detailed evidence.

What you can see

A measured record for every blast, not a reconstruction.

Available

Every meter on the record

Meters of advance are captured every shift as a georeferenced 3D record, giving you a reliable account of how development is progressing against design.

Available

Information between survey pickups

Georeferenced face positions shown against the design plan closes the gap that normally exists between surveys.

Coming soon

Real time compliance to plan

Each round is positioned against the design so adherence to design is recorded while the work happens, not argued over at month end.

See it on a box cut
Available

More independence, fewer interruptions

Report using your own measurements, reducing dependence on the client and interruptions for mapping and survey pickups.

Available

Project beyond the face

Structures captured in 3D with each blast can be projected ahead of development to reduce delays due to unexpected ground conditions.

Available

Deliver a fully documented mine

Every round produces a dataset the client can load directly into their mining software. Upon project completion, the delivery of a full digital record of the work distinguishes you from the competition.

Case study: decline box cut

Four problems caught with one scan

The box-cut for a new decline was completed. One FaceCapture scan from inside the box-cut revealed four conditions were out of tolerance when compared to the design.

What happened

The surface subcontractor who stripped the overburden and blasted the box-cut were off of design. As a result, the portal's planned culvert would not fit.

One five minute scan from inside the box-cut revealed all of the issues with the as-built compared to design, leaving no room for interpretation differences or disagreements.

As-built scan Design

Four conditions out of tolerance at the portal

Four conditions out of tolerance at the portal
# Condition As-built Design Deviation
1 Crown pillar 6.1 m 7.0 m -0.9 m
2 Opening (W × H) 4.5 × 4.8 m 5.5 × 5.0 m -1.0 m wide
3 Off design axis 0.8 m right On axis 0.8 m
4 Floor above design line1 +0.8 m On grade +0.8 m
Caught at handover
$1.4M and 6 weeks2

The deviations are flagged the shift the cut is handed over. Re-blast and re-grade happen before anything is ordered or installed.

Caught at culvert install
$3.8M and 4-5 months2

What it costs when nobody finds out until the culvert arrives: the unit is rejected at the face, crews re-blast around installed ground support, and the portal goes back through engineering and permitting.

Same cut, same deviations. The only difference is when someone measured them.

Record

Daily georeferenced as-builts, replace occasional survey pickups in development headings.

Liability

Every deviation is measured against the design, so responsibility for rework is documented instead of argued.

  1. Floor deviation depends on which design version is used as the reference. Back to content
  2. Cost and schedule figures are estimates and will vary by operation. Back to content
Case study

Trusted by global leaders in underground mining

South32 Hermosa has used MVS since the start of development, and its geology superintendent sees contractor-delivered FaceCapture outputs as a differentiator.

Ready to get started?

Let's connect and discuss how Mine Vision Systems can dramatically improve your underground mapping workflows.

See FaceCapture in action